Building Demolition Process Explained

House Demolition and Building Demolition Process Explained

Building Demolition Process Explained: You will need to demolish old houses or infrastructure on your property as part of your land division to obtain full permission from your city council. The right demolition company can guide you through the steps in order to complete a building demolition job with 100% satisfaction and safety.

Demolition is a very straightforward method for small structures, such as homes, which are just two to three floors high. Using massive hydraulic devices: raised work platforms, cranes, excavators, or bulldozers, the building is pulled down either manually or mechanically.

Why are buildings demolished?

Land moving and/or sinking below the building may be the source of a bad foundation. Another reason may be that the materials of the foundation have deteriorated to the extent that the house is not adequately kept together, which is certainly a dangerous condition, and for the sake of protection, the structure will need to be destroyed.

Also, some people do demolition in order to increase the land value just before they sell it. The building often contains dangerous materials that hit human health really hard when is mixed with air, in most cases, dangerous materials or asbestos are also the reason behind the demolition.

Industrial Demolition

Building Demolition Process: Explained

1. Consult with the best demolition contractors

To streamline the whole operation for you, employ a competent demolition contractor. When you look at other enterprises or organizations, ask them if they coordinate the whole operation, including city government permits, disconnecting any facilities or utilities, and disposing of any waste materials.

2. Ensure safety criteria are met and the team is experienced

Ensure that the contractor is aware of safety protocols and any clean-up tasks unique to the site and is consistent with them. During the quoting process, a reliable contractor will check the site. If the building you are demolishing was made with some dangerous materials, such as asbestos, before proceeding with the removal of the building, verify that they are able to treat these materials.

3. Co-operate to conclude a demolition plan

Creating plans is the most vital and the only way to ensure the most results out of your building demolition project. Depending on the project’s size, this phase will take up to one month or even longer. Make sure you factor in enough time for council approval to prevent any disruptions to the proposal.

4. Get approvals from the local council

Your building demolition contractor will be able to coordinate the permit process with you if the demolition contractor requires council approval for their services. If not, to access any applicable application documents, contact the city authority as soon as you can. Requirements and standards can differ between councils, so it is better to specifically request this guidance from the local council office.

House Demolition

5. Pay the necessary fees and review the safety plan

Building demolition involves other fees and responsibilities other than the council’s approval. The right demolition expert will be able to guide you through all this. The fees involve paying some of the authorities other than the local council. Also, demolition should be notified to Safeworks Australia a few days prior to getting things started.

Besides the demolition company, you as a property owner or representative also have responsibilities n the health and safety of the team members. You can help them by reviewing the safe demolition document provided by Safeworks and asking the company to comply with all of the safety measures. Also, you can provide them with critical information such as building history and more, as much as possible.

6. Disconnect Services and beware of hazardous materials

All of the services such as electricity, gas, water, and so on should be disconnected and removed if possible. Electricity is the most vital and can cause a lot of damage if not disconnected properly.  Similarly, If there is asbestos that needs to be cleaned on your property, your contractor should have an appropriate plan in place to properly clean and dispose of the material, mitigating the harm to on-site staff.

7. Choose the method of demolition and sit back

The right company should already know your plans by now. The company will help you decide on which demolition method is best for you. It’s important to consider the various techniques or equipment that your contractor might use at your house. It is important to reduce disruption to adjacent or neighbouring buildings, as well as decrease the impact of dust and noise on your neighbours. Almighty Demolition has years of experience which ensures the minimum hassle for our clients so that you can actually sit back.

8. Clean and dispose of the debris

A demolition company can decide when and how the waste will be disposed of, and how it will be removed before they start their work. When it comes to hazardous waste, such as asbestos, this is highly important.

Conclusion

The difference between your land being built on schedule and under budget or facing expensive delays or problems that impact your priorities may be a well-planned demolition operation. A trustworthy provider would be able to handle the process for you and streamline it.

Licensed building demolition contractors in Newcastle from Almighty have the right experience to provide you with the best demolition services ever. Contact us for a free quote and we wish you all the best for your upcoming project.